Get Adobe Flash player

The Convoy will depart at 9:30 am sharp and the route of the 2017 Convoy will be the same as last year.
We will depart from 651 Johnson Rd and heading East on Johnson Rd, then we will turn left again onto Stapylton Rd and then onto the Logan Motorway as in previous years

We will travel along the Logan M/way in the left lane, then veer left onto the Gateway M/way. We remain in the left hand lane of the Gateway until the merge point indicated on the map below. At that point we merge to the right hand lane on the Gateway M/way and remain there all the way to the Deagon Deviation.
Logan and Gateway merges resized
Please note the picture below illustrates the road sign that the convoy vehicles merge at.
Gateway Merge 1 resized

A full Google Maps route map can be found HERE